Renovated existing HVAC, duct work, piping, plumbing system. Provided 150 tons Air Cooled Chiller, twenty fan coil units, CRAC unit, In-row Coolers,
GSA – COB MECHANICAL / AIR HANDLERS
Replaced Air Handling units, split systems, cooling tower, radiator valves, and piping repairs.
GOVERNMENT PRINTING OFFICE – BLDG D
Furnished and installed four 133 ton Air-Cooled Chillers with a Systencon pumping package enclosure with four VFDs, three Pumps, Expansion Tank and an
MT WEATHER FEMA BUILDING 105
Removed 13 VAV's, one Liebert Unit, and duct work. Installed 13 new VAV's with Hot Water Coils, two new 30 ton Liebert Units with outdoor condensers,
FORT DETRICK AHU BUILDING 539
Replaced four SAHU's (220, 221, 222, 232).
NNMC – BLDG 62
Design/Build a new laundry room with (3) new washers and dryers. Provided (2) new fan coil units along with exhaust fans and duct.