DEPT OF JUSTICE – ANTEFIXAE

LOCATION: Washington DC
OWNER/GC: GSA
BUDGET: $604,944
DESCRIPTION: 

Design/Build the Antefixae. Removed existing Antefixae for repair to ensure they would be secure during heavy snow storms. Each Antefixae was tested to hold over 2,500 lbs.