Design Build

BLDG. 2006, CHILLER

QUANTICO CHILLER REPLACEMENT

Reduced cooling energy consumption by providing new Chillers in nine buildings. For each of those buildings, GMI provided Design and Engineering services as well More…

Server Racks

FAA SERVER – BLDG 10B

Installed new critical server room with 40 server racks, UPS system, 400KW generator, 100 ton Air Cooled Chiller, 9 Liebert in-row cooling units, fire More…

Fort Belvoir 201 - 3

FORT BELVOIR – BLDG 201

Updating Building 201 included drywall, paint, doors, floors and ceilings. Renovated HVAC System. ¬†Furnished & installed 7 Indoor central station Air Handler Units, 58 More…

1-2-15 051

CENSUS BUREAU

Assisted in the design of the HVAC system; Furnished and installed new 20 ton Air Handler Unit with 5 VAV’s; Established all new Control More…

gaghan

FORT BELVOIR 1400 DECENTRALIZATION

Removed 18 buildings from central heating plant and installed boilers, unit heaters, air handling units, flues, roofing, concrete & demolition